The Summerland Advocate-Messenger - Reliable, Trustworthy Reporting, Capturing The Heartbeat Of Our Community

By LuAnn Schindler
Publisher 

Dirt work underway at Summerland site

 

LuAnn Schindler

Bob Napier pulls a disc through a field at the Summerland school site.

A little rain, cold temperatures and a brisk breeze did not stop dirt work at the Summerland school site, March 25.

Since then, dirt work has continued, a new temporary driveway has been installed along Summerland Road and a retention wall was constructed.

...



For access to this article please sign in or subscribe.










 

Reader Comments
(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2019